Products
DELETE
DELETE
Projects
LIDL-Luton
This case study shows how the DUCO louvre wall system met key performance and construction needs while improving the building's appearance.
Tower Wharf Liverpool
The new Tower Warf building in Liverpool is the start of the new enterprise zone of the Wirral water regeneration project. An excellent BREEAM assessment was the starting point. DucoSun Cubic solar shading not only plays a role against overheating, but also contributes to a sleek design.
De Spakler - Amsterdam (NL)
De Spakler is a residential tower block with an EPC value of 0. The building is a pre-eminent example in terms of architectural construction with a focus on energy neutrality, which came about through a professional collaboration of several leading parties including Mecanoo, an architects’ firm, and DUCO.
News & Events
05/03/2024 DUCO present at Data Centre World Frankfurt with high-quality ventilation solutions for data centres
From the 22nd to the 23rd of May 2024 the Data Centre World 2024 event will take place in Frankfurt. Also DUCO will take part as an exhibitor at booth F092 to give insights on its high-end ventilation solutions, specifically for adequate and intensive ventilation of data centres to avoid overheating.
29/02/2024 DUCO presents mechanical ventilation solutions at InstallerSHOW in Birmingham
During InstallerSHOW 2024, the UK's largest heating, plumbing and renewables expo, DUCO will showcase various mechanical ventilation solutions at booth 5C10, that facilitate the pursuit of obtaining a passive house label.
22/01/2024 DUCO redefines data centre efficiency with advanced ventilation and solar shading solutions
Did you know that the relentless heat generated within data centres necessitates effective ventilation and solar shading solutions?